Founded in 2016, New Green Energy provides professional subcontracting services in production and technical service throughout Turkey. By prioritizing quality, trust, and customer satisfaction, we continue to be a strong solution partner in the sector.
Vision
Vision
To provide high-quality services both domestically and internationally by adopting innovation and continuous development as a fundamental principle.
Mission
Mission
To adopt customer satisfaction as the main principle and meet needs quickly without compromising quality.
To be a company that creates awareness with its equipment, quality, and experience in the sector.
To provide maximum benefit to all our customers by keeping up with continuously developing and renewing technologies.
Services
Monoblock Concrete Substation Production
Field-ready monoblock concrete substation production for energy infrastructure.
ASTOR ENERJİ A.Ş.• Between 2018 and 2020, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2019 and 2025, we carried out the production of 154 kV high voltage circuit breaker panels.
• Between 2024 and 2025, we performed cabling workmanship for mobile transformer substations.
• Between 2025 and 2026, we carried out the production of monoblock concrete kiosks.
• Between 2025 and 2026, we carried out RMU mechanical assembly works.
• Between 2025 and 2026, we performed after-sales technical service works./media/2026/04/9c78d05d-c916-4f06-ab4e-021ca4e9e741.png
ATS ELEKTRİK PANO A.Ş.• In 2024, we carried out the production of sheet metal kiosks by performing mechanical assembly and cabling workmanship.
• In 2025, we carried out the production of sheet metal kiosks by performing mechanical assembly and cabling workmanship.
• In 2025, we carried out the production of low voltage (LV) panels by performing mechanical assembly and cabling workmanship./media/2026/04/95cb588d-766f-4cc7-94c9-5878302ad15c.png
LMZ ELEKTROMEKANİK SAN. VE TİC. LTD.ŞTİ• In 2024, we carried out the mechanical assembly and cabling workmanship of mobile transformer substations on a turnkey basis./media/2026/04/bc96e1c2-30fd-474b-97f3-1774aac5b5a1.jpeg
KONTROLMATİK TEKNOLOJİ ENERJİ VE MÜHENDİSLİK A.Ş.• In 2024, we carried out the production of AC, DC, metering, and KRP panels by performing mechanical assembly and cabling workmanship./media/2026/04/3b2a6f3a-d52e-419c-ac5b-65b1deac6425.jpeg
ARMTEK ELEKTRİK TAAHHÜT A.Ş.• Between 2020 and 2024, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2023 and 2024, we carried out the production of concrete kiosks and sheet metal kiosks by performing mechanical assembly and cabling workmanship.
• Between 2023 and 2024, we carried out the production of modular cells by performing mechanical assembly and cabling workmanship.
• Between 2023 and 2024, after-sales technical service was provided throughout Türkiye and abroad.
• Between 2024 and 2025, we carried out the production of mobile substations and metal clad panels by performing mechanical assembly and cabling workmanship./media/2026/04/89600b14-d94b-41ef-b459-9dae5fc09395.jpg
VOLTBERG ENERJİ SAN. VE TİC. A.Ş.• Between 2024 and 2025, we carried out the production of concrete kiosks on a turnkey basis.
• In 2025, we provided after-sales technical service./media/2026/04/f44ec920-a8da-43b7-a547-c3eb5f32fe67.png
ELEKTROLOJİK ENERJİ TEKNOLOJİLERİ LTD. ŞTİ.• Between 2024 and 2025, we carried out the production of modular cells by performing mechanical assembly and cabling workmanship.
• Between 2024 and 2025, we carried out the production of low voltage (LV) panels by performing mechanical assembly and cabling workmanship.
• Between 2024 and 2025, we carried out the production of metering panels by performing mechanical assembly and cabling workmanship./media/2026/04/dc8293c4-df7a-4804-8168-e93b966f1cc0.jpg
GAMA GÜÇ SİSTEMLERİ MÜHENDİSLİK VE TAAHHÜT A.Ş.• Between 2024 and 2025, we carried out RTU panel installation and connections, SCADA cable laying, and commissioning works at domestic sites.
• In 2025, we carried out sheet metal kiosk installation and mechanical assembly works at domestic sites./media/2026/04/0337ebff-10bd-4b86-8b21-2d56501e1256.jpeg
EKOS TEKNOLOJİ VE ELEKTRİK A.Ş.• In 2025, we carried out cabling workmanship for TEİAŞ mobile transformer substations.
• Between 2025 and 2026, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2025 and 2026, we carried out the production of air-insulated cells by performing mechanical assembly and cabling workmanship.
• Between 2025 and 2026, we carried out the production of primary GIS systems./media/2026/04/77c38569-d20b-415a-8f9f-1f50f219fbd0.jpeg
SFA ELEKTROMEKANİK ELEKTRİK SAN. VE TİC. A.Ş.• Between 2025 and 2026, we provided after-sales technical service./media/2026/04/5c8b88b0-ce63-4c62-99fb-3fd31ad49fca.jpeg
HAWK POWER ENERJİ A.Ş.• Between 2025 and 2026, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship./media/2026/04/3587818c-9ce9-458f-a09a-f696f960f0de.jpeg
CW ENERJİ MÜHENDİSLİK TİC. VE SAN. A.Ş.• Between 2019 and 2026, we provided after-sales technical service.
• In 2026, we carried out the production of modular cells./media/2026/04/fac8cdb3-2941-4cf7-817d-7a42d1608162.jpeg
KVK ELEKTRİK ENERJİ A.Ş.• Between 2019 and 2026, we provided after-sales technical service./media/2026/04/0c23f7d0-ffc8-47c2-902b-f6bba8c1f584.jpeg
ULUSOY ELEKTRİK A.Ş.• Between 2013 and 2022, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2013 and 2022, we carried out the production of RMU units.
• Between 2013 and 2022, we provided after-sales technical service./media/2026/04/794d53e2-d9e2-46fe-93ff-16f853d4ec43.jpeg
AKTİF ELEKTROTEKNİK A.Ş.• Between 2019 and 2020, we carried out the production of metal clad panels by performing cabling workmanship./media/2026/04/ac847c0c-398a-4196-a236-d4852eb723bb.jpeg